At plant 750 the QC line is inside the second overhead door on the south side (parking lot side). The coaches come off the line at the east end of the building and are driven along the entrance road to the front of the plant and enter back into the pant at the second overhead door. The QC line is in the area beside the storage area for parts and the coach side lamination press. Remember that Thor does not put water on the coach as the are stored outside awaiting dealer pickup. The water lines are air pressure checked. The Thor delivery checklist given to the dealer explains how to complete the fresh water and waste water hookup. If you show up for a tour about a couple hours early and park near personnel gate, you can watch the finished coaches parade to the QC area. We counted 9 ACEs, one Hurricane and 2 Windsports. This was before the factory switched to batch production in 2018.