We have a Challenger 36fd. It was the last one produced. They have revamped this model and it is now a 37LX. We were told that we should get ours in 4 to 6 weeks because they wanted to get it done so they could get started on the new model. Unfortunately for us it took 11 weeks and we picked it up my first day back to school (I am a teacher). We have found many things wrong with it. The worst was that they had let the circle of flooring that they cut out to install the toilet fall into the black water tank and never took it out. We were camping and couldn't drain our black water so we had to use the campground bathrooms. Luckily the dealership was able to fix it as soon as we got back. The finish work is terrible in our unit .We are taking it in with a long list of problems. Hope you have better luck with yours.
__________________
|