I brought my MH back to my home where I have 50A service. I plugged in and continued my 50A testing, 2 legs 240V, etc. All worked well with no errors. I had forgotten to run the generator with prior test, so I fired it up. This became my monthly run as well as testing the wiring and in particular the ATS. All worked well.
I am not a electrician nor an engineer but have been doing electrical and electronic work for about 55 years. This was one of my biggest challenges and with the help of everyone on this thread, was successful beyond my expectations.
Earlier I said that I would keep everyone posted on my endeavor and at conclusion I would give everyone a list of parts purchased and labor involved.
The labor was all mine so was free and took 9-10 hours, including testing. I purchased all parts from Amazon except for a few miscellaneous items at Lowes locally. This is what I purchased:
30' main power cord 6/4 gauge $127
6/4 wire to used the unit internally 30' $87
50 Amp locking power inlet $70
50 Amp ATS $152
AC/DC power distribution panel without converter $90
Dual 50 Amp breaker $12
Taxes $43
TOTAL material cost $614.
Came in within budget of $600-650.
This concludes my updates but will answer any questions.
__________________
|