Ok, thats good to know. Thanks for the info
Your entire kit was bolt on right? Bolt on to or around the frame drill holes for the central pump and other stuff like controller on the dash?
Where did you have to use the angle drill at?
How long did it take you to compete the entire job?
I know im asking a lot of question but I'm tring to wrap my mind around the entire project so I know what else I might need and how much time to set aside for it.
__________________
2017 Axis / 25.4: Big Foot Levelers, Aims 1200 Watt inverter, Ceramic Window Tint, Full River AGM 6V batteries, Front Hellwig Sway bar / Rear Track Arm, Safe T Plus Steering Stabilizer, PD 4655 converter, Hard Wired Surge Guard, WEboost + WiFi Ranger, LED Headlights/Driving lights, TPMS, Surge tank, Tornado flush, Viair Compressor
|