Quote:
Originally Posted by halfprice
Another project done this morning. I added an additional seelevel monitor in the sewer bay. This way I can see how full the black tank gets when cleaning it with the saniflush
Much easier to install than the original monitor inside the mh
The power wires to the 2 sensors are right at the tanks and I got power ground from the cargo bay light to the right of the black tank
I mounted the monitor on a 2 gang plastic electrical box. Used my jigsaw to cut out the hole on a blank cover. Used double sided tape and a couple drops of silicone to stick it to the front of the black tank
Used a lot of gorilla tape to hold the wires up to the black tank
Jerry Attachment 23671Attachment 23672
|
Sure beats guessing Jerry. I’m just now getting my first and you show be a reason for two!