After months of putting off installing the surge protector that was sitting in the garage I finally got it done! I was originally going to follow Jerry's install and only hook to shore power side before the transfer switch, coach wiring wasn't long enough, had to install after the transfer switch. Took me longer than I thought, spent 30 min cleaning up the crud Thor left, hard to believe someone does such sloppy work! I would be ashamed if I did that.
The 6 gauge wires were really stiff and hard to manipulate in to the connectors. Glad I got it done but wouldn't want to do it again, back is killing me from all the bending over. Going to have to hit the fermented pain killers!