The chf will take 2 hrs on the front and maybe 3 on the rear. You will need to take off the link rods on the rear and switch them from side to side because of the extra piece attached to the bottom of the link rod.
You will need a good impact gun, a breaker bar, 15mm and 18mm deep impact sockets and wrenches. You may need the help of a floor jack to push the sway bar into place when connecting the final tie rod.
__________________
|