In order for the lower track grooves to drain completely, I had to open the drain holes to where they were flush with the track bottom--that solved a lot of the retained water in the tracks. Used a Dremel to open the holes.
Our panels are clear on both sides and lock to the front of the shower.
__________________
2016 Tiffin 40QBH
2015 38RSSA--traded
2005 36TK3--retired, but it was a good one
2017 F450 KR
|