I doubt if you will need a backup. Apparently, the BIM 160 is much more reliable than the BIRD that it replaced.
I was only getting 5-10 amps from my chassis alternator to the coach batteries with 30-40% depleted batteries. It jumped to 20-30 amps after switching the wires.
David
__________________
|