Quote:
Originally Posted by JGallagher
How long should you let the generator warm up before applying a load?
I thought that it was ok to turn things on once the generator went through its startup sequence.
|
The issue is not always the generator but with the ATS not allowing the generator to get up to speed (between 30 seconds and 1 minute) before it switches over to the generator and applies the loads.