Agree, guess needed to be more clear on 50 amp shore, L1 and L2 can each draw 50 amps with shore. Would have to have a 12K generator to equal shore, possible a weight issue. Just wanted to emphasize generator load management. Being able to manage electrical loads should allow for use of two AC’s without issues as long as your not running every appliance at the same time. As for my yacht experience, trying to run two 12k gens with 5 staterooms all AC units on, hot water heater, oven, blow dryers, and everything else always blew a breaker. Folks on board didn’t know any better but I had to tend to what was on/off in order to keep things going as needed.