Yep same here TripleG,
Thats why we try to make it like 3 - 5 hour venture. Sometimes I will show up the day before and add a few # to each tire, check the oil etc. That way all I have to do is back it out of storage and load the bike and some food / drinks.
I see you have a Palazzo. I love Palazzo's!
I like the mid entry and I think the anything under like 38 foot would be a sweet spot for a DP for me.
__________________
2017 Axis / 25.4: Big Foot Levelers, Aims 1200 Watt inverter, Ceramic Window Tint, Full River AGM 6V batteries, Front Hellwig Sway bar / Rear Track Arm, Safe T Plus Steering Stabilizer, PD 4655 converter, Hard Wired Surge Guard, WEboost + WiFi Ranger, LED Headlights/Driving lights, TPMS, Surge tank, Tornado flush, Viair Compressor
|